How to begin repair works regarding the apartment?

The very first stage of the repair of older apartments is typically the destruction and taking out first of almost all from the dilapidated wall space and partition wall space, removing the wall structure and ceiling coating. This stage is usually one of typically the most “dirty” phases in the repair.

One more one of the most important and “dusty” works is the windows block replacement. You need to do this first of all due to the fact dirt and dust will be unallowable in the course of following stages plus it is forbidden at all in order to open windows throughout painting and picture works (large droplets of the temp and moisture are unallowable). After installation windows and windowsills it is essential to pack them immediately in polyethylene film and to be able to cover windowsills in addition with the fiberboard (in order to avoid scratches).

The next period is wiring. Electrical wiring can be set up in walls or perhaps along the flooring. Wiring is made inside the plumbing to ensure electrical safety and increase reliability. The water pipe protects wiring from external damages in addition to allows to substitute the wire totally without breaking wall space and floor basically by inserting the new wire instead regarding the old one.

House Painting comes after the wiring. Typically the frequent mistake in the course of the simultaneous executing of such works occurs when employees forget to place out among the cables and house artists have already plastered and smoothed your wall. As a new result, additional works are necessary to be able to seal chases within the finished wall. The particular places of the feed switch in addition to wall outlet place and the number need to be thought-out in advance. The structure of power electrical wiring is usually incorporated into the design job.

Later on Duraflex must be prepared to service in circumstance of failures. Inside addition to the particular wirings, the telephone wire and the TELEVISION cable are presented. The power cable must not be laid out near the telephone and antenna cabling to avoid noises pickup and disturbance. Probably the most peculiar instant is laying out the TV cable. In order to be able to make two (or three) TV makes its presence felt the apartment the second cable is often simply “firmly soldered” in parallel, so the cable level of resistance is lowered. Since a result, the particular display quality is damaged, many programs can’t be received in addition to etc. In purchase to avoid these kinds of situation it is usually necessary to invite a specialist together with special equipment. He or she will gauge the transmission level of the particular each TV-feeder and install TV-amplifiers or even TV-filters.

Painting is among the most long-term process, this is why it is carried out simultaneously in all premises, if it is feasible. Delays are connected with the technology. Each applied level of the plast typer (or filling inside finishing) must dried out completely before the function will continue.

Works in sanitary preparations and the cooking area begin simultaneously together with house painting. It is best to fulfill alleged “dirty” works inside the first location and simultaneously. Inside accordance with the plan of the hygienic technician location welding, wall chasing plus pipe run are conducted. Steam rad admissions are well prepared, taps and mounting brackets are mounted, yet radiators are not set up.

Then works inside sanitary arrangements usually are conducted based on the program. The bath is mounted, then surfaces are smoothed out and the tile is laid upon walls. The following stage is building ceiling and putting tiles on typically the floor. And from last other hygienic devices, mixers in addition to accessories are mounted.

After wiring, installation of rosette plates and terminal containers the voltage is checked in all stage. Ends of wiring are insulated in addition to laid out into rosette plates. Electrical sockets and breakers are not installed during this stage in buy to save their particular surface appearance. The particular finish puttying regarding walls is carried out simultaneously. The technologically exact control of blow drying of the coating of the plaster (filling) is carried out by drymeter. It is a new special instrument that measures moisture associated with the material.

The next stage is the means of fill. Fill up may be made along with different materials – from usual brickwork cement-sand mixture in order to self-aligning floors. The particular advantage of the particular simple mixture is its cheapness, the disadvantage is of which such mixture is usually much harder aligned at the degree and the final dry time associated with such fill will be 40 days, simply then the following stage of the particular work together with floor may be conducted, i actually. e. the period is too long. Self-leveling self-aligning floors are much more expensive, nevertheless more technological. Aligning occurs almost “automatically” i. e. fluid solution of mixture is poured out, then it operates and you receive the horizontal area. The final dried out time is 15 days i. e. you have significant time economic climate. The system “warm floor” is installed to the fill. When the so-called “wet processes” are inapplicable the technology associated with the dry aiming (the fill technology) is used angles for floors together with adjustable floor battens are mounted.

Following fill door containers and door are usually installed. Installing of entry doors must take directly into the account width of future flooring. After installation the door can be taken off its knobs and removed till the end regarding repair or loaded into polyethylene film to protect from damages. Simultaneously ceiling can be painted and the tile may be laid in this premises where it absolutely was planned. The tile must be laid on the absolutely dry out overlay.

Finishing associated with the floor installation depends on the particular planned covering. In most cases (if finish covering is not really the tile) fill is covered by simply bitumen mastic plus plywood sheets are usually laid. They are usually fixed to the ground by self-tapping screws. One plywood sheet is fixed by simply 30-50 self-tapping anchoring screws to provide the close fixing regarding plywood and long-term service from the flooring without squeak plus bulging. The hdf gives the extra heat- and acoustic insulation. After increasing of the plywood is finished, wallpaper with regard to painting can become pasted on surfaces.

In premises where finish covering of the floor will be laminated flooring or perhaps parquet hoard, the ordinary wallpapers are pasted (not for painting) in the 1st place. Then the particular floor covering is attached.

If finish masking in the floor will be the block parquet, the parquet is laid in the first place, then it is scraped and covered by simply one layer of lacquer. After this specific the ordinary wall-papers are pasted as well as the parquet is have the rest tiers of lacquer (depending around the quality regarding the parquet plus lacquer). The pointed out consequence is associated only with this kind of scrambling process when the great amount of dust is usually created. Regardless of the fact that very good floor grinders are equipped with the vacuum cleaner, the sufficient amount associated with dust is brought on on surrounding subject matter including walls. Dirt is very tartish and is badly washed off. That is why in order not to harm wallpapers, they usually are pasted after trying and in purchase the parquet tend not to absorb the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the particular main works could be considered to be able to be finished. It is left only to install the plinths, decorative elements, breakers and sockets, drape holders, to hang doors, plant-bands and others.

To conclude that is necessary to note that the sequence of performs was listed inside general and may change based on the certain situation – the particular number of areas in premise, your current resources, peculiarities of the construction of the multilevel premises. It is based on common sense and every person able to analysis can separately create such the sequence.